MS Project schedules, real Project Controls.

Microsoft Project is great for building schedules. It is not built for portfolio EVM rollup, AI variance detection, change orders, RFIs, submittals, or cash flow. FridayReport.AI imports your MPP and adds the controls layer capital programs actually need.

Get started · Read the guide

MS Project Schedules Plus the Controls Layer

MS Project Plan 5 covers planning. FridayReport.AI covers what comes after the schedule: defending the EAC, detecting variance early, and running the field workflows that feed cost and schedule impact straight back into EVM.

AI Variance Detection

Continuous CPI / SPI monitoring with AI-flagged early warnings on change-order velocity, RFI aging, and threshold breaches — before the variance becomes material.

Portfolio EVM Rollup

True bottom-up EVM rollup at portfolio and organization level — no Project Server, Project Online, or Power BI patchwork required.

Four EAC Scenarios

Standard PMI EAC formulas (CPI, CPI × SPI, Optimistic, Pessimistic) side-by-side, with an editable target EAC and live TCPI gauge.

RFIs, Submittals & Change Orders

Full RFI, submittal, and change order registers with cost / schedule impact and reviewer workflows — feeding straight back into EVM and EAC.

Cash Flow & Multi-Scenario Cost Grid

Spreadsheet-grade AOP / FCST / ACT / EAC grid with month / quarter / year views and a cumulative cash-out curve for liquidity planning.

Lockdowns & Audit Trail

Lock finalized periods so they cannot be retroactively edited. Every cell-level change captured with who, what, and when.

Scheduling & Schedule Integration

MS Project (MPP / XML) schedule authoring

Imports MPP / XML; dedicated authoring is on roadmap.

MS Project (MPP / XML) schedule import

Primavera P6 (XER) schedule import

WBS, predecessors, durations preserved on import

Critical path analysis

Critical path read in from MPP / XER.

Re-import each cycle to track baseline vs current

Multi-project / multi-program scheduling

Gantt chart / visual scheduling

Earned Value Management (EVM)

BAC, PV, EV, AC tracking

CPI, SPI, CV, SV computation

EAC, ETC, VAC, TCPI computation

Four EAC scenarios side-by-side (CPI, CPI×SPI, Optimistic, Pessimistic)

Editable target EAC with live TCPI gauge

Portfolio-level EVM rollup (bottom-up)

CPI × SPI quadrant chart

S-Curve (PV / EV / AC / EAC) at project & portfolio

CPI / SPI threshold heatmaps over time

Forecasting & Cash Flow

Multi-scenario cost grid (AOP / FCST / ACT / EAC)

Period views (month / quarter / year)

Cash flow forecast (Planned vs Actual outflows)

Cumulative cash-out curve

Configurable cost hierarchy (Financial View / Category / Spec)

Cell-level change history on forecasts

Lockdowns through month-end

AI & Risk Intelligence

AI-powered project risk assessment

AI-powered portfolio risk assessment

AI variance detection (CPI / SPI early warning)

AI change-order velocity & RFI aging alerts

Shareable public risk assessment links

Risk register with change history

Field Execution

RFIs (Requests for Information)

Submittals log & reviewer workflow

Change orders & PCOs with cost / schedule impact

Daily reports (weather, labor, equipment)

Schedule of Values & AIA-style pay apps

Drawings & markups

Punch list

Quality & safety inspections

Governance & Reporting

Portfolio health scoring (RAG)

Health status history tracking

Project change logs / audit trail

Custom dashboards & saved views

Report subscriptions (scheduled email)

Analytics API for Power BI / external tools

Lessons learned module

Project intake / demand management

Platform, UX & Pricing

Cloud-native, modern web UI

Dark mode

Magic-link / passwordless sign-in

Onboarding flow & in-app guide

Demo data generation

Free forever plan

Setup time

Minutes — sign in and import the MPP.

Frequently asked questions

Do I have to stop using Microsoft Project?

No. Most teams keep MS Project as the schedule authoring tool and use FridayReport.AI for EVM, forecasting, RFIs, submittals, change orders, cash flow, and executive reporting. We re-import the MPP / XML each cycle so the schedule and the controls always agree.

What about Project Online or Project Server?

FridayReport.AI replaces the portfolio rollup, dashboards, custom fields, and Power BI reporting that organizations typically build on top of Project Online — without the Plan 5 license, the SharePoint dependency, or the implementation project.

How is pricing different from Microsoft Project?

Microsoft Project uses a Plan 1 / 3 / 5 license matrix per user, plus optional Project Online. FridayReport.AI offers a free forever plan and transparent per-seat pricing with no implementation fee.

What about MS Planner?

MS Planner is for lightweight task tracking, not capital project controls. FridayReport.AI integrates with Planner for sync, but the comparison that matters for capital programs is FridayReport vs MS Project for scheduling and EVM.