Procore covers the field. We add real Project Controls.

Procore is built around the GC's day-to-day field execution. Capital owners and EPC controls leads still need portfolio EVM rollup, four EAC scenarios, AI variance detection, and a real schedule integration with Primavera P6 and MS Project. FridayReport.AI delivers all of that — for a fraction of Procore's enterprise price.

Get started · Read the guide

Field Execution Plus the Owner-Side Controls Layer

Procore is the system of record for field execution. FridayReport.AI is the system of record for capital program controls — EVM, EAC, cash flow, and the AI variance layer that owners need to defend the forecast every month.

Portfolio EVM Rollup

True bottom-up EVM at portfolio and organization level — BAC, PV, EV, AC, CPI, SPI, EAC, ETC, VAC, and TCPI rolled across every program. Procore reports cost-to-complete, not real EVM.

Four EAC Scenarios

Standard PMI EAC formulas (CPI, CPI × SPI, Optimistic, Pessimistic) side-by-side, with editable target EAC and a live TCPI gauge — built for owner-side cost forecasting, not GC billings.

AI Variance Detection

Continuous monitoring of CPI / SPI thresholds, change-order velocity, and RFI aging. The AI flags projects before month-end variance reports — Procore has no native AI variance layer.

Primavera P6 & MS Project Import

Re-import P6 XER and MS Project MPP / XML each cycle with WBS, predecessors, durations, and critical path intact. Procore integrates with schedules; it does not own the controls layer on top of them.

Cash Flow Forecasting

Monthly Planned vs Actual outflows, future months projected from FCST or distributed ETC, and a cumulative cash-out curve — true treasury-grade cash flow planning, not GC billing exports.

Lockdowns & Audit Trail

Lock ACT (or any scenario) through month-end so finalized periods cannot be retroactively edited. Cell-level change history with who, what, and when.

Scheduling & Schedule Integration

Primavera P6 (XER) schedule import

MS Project (MPP / XML) schedule import

WBS, predecessors, durations preserved on import

Critical path scheduling (CPM)

Imports CPM from P6 / MS Project; dedicated CPM editing on roadmap.

Re-import each cycle to track baseline vs current

Multi-project / multi-program scheduling

Gantt chart / visual scheduling

Earned Value Management (EVM)

BAC, PV, EV, AC tracking

CPI, SPI, CV, SV computation

EAC, ETC, VAC, TCPI computation

Four EAC scenarios side-by-side (CPI, CPI×SPI, Optimistic, Pessimistic)

Editable target EAC with live TCPI gauge

Portfolio-level EVM rollup (bottom-up)

CPI × SPI quadrant chart

S-Curve (PV / EV / AC / EAC) at project & portfolio

CPI / SPI threshold heatmaps over time

Forecasting & Cash Flow

Multi-scenario cost grid (AOP / FCST / ACT / EAC)

Period views (month / quarter / year)

Cash flow forecast (Planned vs Actual outflows)

Cumulative cash-out curve

Configurable cost hierarchy (Financial View / Category / Spec)

Cell-level change history on forecasts

Lockdowns through month-end

AI & Risk Intelligence

AI-powered project risk assessment

AI-powered portfolio risk assessment

AI variance detection (CPI / SPI early warning)

AI change-order velocity & RFI aging alerts

Shareable public risk assessment links

Risk register with change history

Field Execution

RFIs (Requests for Information)

Submittals log & reviewer workflow

Change orders & PCOs with cost / schedule impact

Daily reports (weather, labor, equipment)

Schedule of Values & AIA-style pay apps

Drawings & markups

Punch list

Quality & safety inspections

Governance & Reporting

Portfolio health scoring (RAG)

Health status history tracking

Project change logs / audit trail

Custom dashboards & saved views

Report subscriptions (scheduled email)

Analytics API for Power BI / external tools

Lessons learned module

Project intake / demand management

Platform, UX & Pricing

Cloud-native, modern web UI

Dark mode

Magic-link / passwordless sign-in

Onboarding flow & in-app guide

Demo data generation

Free forever plan

Setup time

Minutes — sign in and import a P6 / MPP file.

Frequently asked questions

Do I have to replace Procore?

No. Many capital owners run Procore as the GC's field-execution system and run FridayReport.AI as the owner-side controls layer — true EVM rollup, EAC scenarios, cash flow, and AI variance detection. The two coexist cleanly, and FridayReport.AI re-imports schedules from P6 / MS Project so the controls layer always agrees with the schedule of record.

Can FridayReport.AI replace Procore for field execution?

For owners and program management offices that don't need GC-side payroll integration or trade contractor management, FridayReport.AI's RFIs, submittals, change orders, daily reports, drawings, punch list, and pay apps cover field execution end-to-end. Many programs adopt FridayReport.AI as the all-in-one platform and skip the Procore enterprise contract entirely.

How is pricing different from Procore?

Procore is sold as an annual enterprise contract sized to your construction volume, with paid add-ons for Analytics, BIM, and other modules. FridayReport.AI offers a free forever plan and transparent per-seat pricing — no implementation services, no volume-based pricing, no module gating.

Does Procore do real EVM?

Procore tracks budget, cost-to-complete, and forecast — useful for GC billings — but it does not compute standard EVM metrics (PV, EV, CPI, SPI, TCPI, VAC) or roll them up across the portfolio. Owners and EPC controls leads consistently need a separate tool for real EVM. FridayReport.AI is built for that role.