Project Controls & EVM for Capital Projects

From Primavera P6 and MS Project schedules to full Earned Value Management — run your entire capital program with the cost, schedule, and forecast controls your owners, controls leads, and PMOs depend on.

Get started · Read the guide

Capital Projects Need More Than a Generic PMO Tool

Capital programs run on baselines, EVM, change orders, and forecast-to-complete confidence. Generic project tools cannot answer the questions your steering committee asks every month.

Schedule Slippage Against the P6 Baseline

Imported P6 / MS Project baselines drift the moment work starts. Without continuous SPI tracking and critical-path visibility, slippage hides until milestones are missed.

Cost Performance Erosion You Catch Too Late

When CPI quietly slides below 1.0 across a portfolio, the cumulative impact on EAC is brutal. Spot CPI, CV, and TCPI trends early — not at month-end close.

Change Order & RFI Leakage

Unlogged PCOs, undocumented field directives, and RFIs that never close turn into disputed claims. Capture cost and schedule impact the moment a change is identified.

Forecast-to-Complete You Cannot Defend

Owners want a defensible EAC every month: CPI-based, CPI×SPI, optimistic, and pessimistic — with the assumptions, lockdowns, and audit trail that survive an external review.

One Platform for Schedule, Cost, and Field Execution

FridayReport.AI brings industry-standard Project Controls — Earned Value, S-Curves, forecasting, and cash flow — together with the field execution modules your construction teams already need.

Capital Program Portfolio with EVM Rollup

See every project across your capital program in one view: baseline vs forecast, CPI / SPI heatmaps, EAC vs BAC, and the CPI × SPI quadrant that pinpoints which projects need executive attention.

Primavera P6 & MS Project Schedule Integration

Import P6 (XER) and MS Project (MPP / XML) schedules with WBS, predecessors, durations, and critical path intact. Re-import each cycle to track baseline vs current and surface slipping milestones.

AI-Powered Variance & Risk Detection

Continuous monitoring of CPI, SPI, milestone slip, change-order velocity, and RFI aging. The AI flags projects before they breach thresholds — so corrective action happens, not post-mortems.

Built for the Way Capital Programs Are Delivered

Whether you own a multi-billion capital portfolio, deliver an EPC project, or execute a turnaround — FridayReport.AI runs the controls and the field together.

Capital Program Portfolios

Plan and govern multi-project capital programs with EVM rollup, baseline vs forecast variance, and executive dashboards built for steering committees and capital review boards.

Infrastructure & Heavy Civil

Manage road, bridge, utility, and public works projects with P6-level scheduling, milestone tracking, permit management, and multi-agency coordination.

Plant Turnarounds & Shutdowns

Run high-density turnaround windows with critical-path tracking, daily progress against the baseline, and EVM that lets you see CPI / SPI hourly during outages.

Campus & Facility Expansions

Oversee multi-building campus and facility expansions with cross-project resource planning, shared milestones, and capital program oversight for owners.

Frequently asked questions

Do I have to replace Primavera P6 or Microsoft Project?

No. FridayReport.AI imports Primavera P6 (XER) and Microsoft Project (.mpp / XML) schedules with WBS, predecessors, durations, and critical path intact. Most capital programs keep their scheduling tool of record and use FridayReport for EVM, RFIs, submittals, change orders, cash flow, and executive reporting.

Does FridayReport.AI handle full Earned Value Management?

Yes — BAC, PV, EV, AC, CPI, SPI, EAC, ETC, VAC, and TCPI are computed at the project level and rolled up bottom-up to portfolio and organization. Four standard EAC scenarios (CPI, CPI × SPI, Optimistic, Pessimistic) sit side-by-side with an editable target EAC and a live TCPI gauge.

Can I run RFIs, submittals, change orders, and pay apps on the same platform?

Yes. RFIs, submittals, change orders / PCOs, daily reports, AIA-style pay applications, drawings & markups, punch lists, and quality / safety inspections are all built in — with cost and schedule impact feeding straight back into EVM and EAC.

How does the AI variance detection work for capital projects?

The platform continuously monitors CPI / SPI thresholds, change-order velocity, and RFI aging across every project. When a project starts to drift, it is flagged in the portfolio dashboard before month-end close — so program managers have time to act, not just report.

Is there really a free plan for general contractors and owners?

Yes. FridayReport.AI offers a free forever plan with no per-seat license tax. You can sign in, import a P6 or MS Project schedule, and have live EVM, S-Curves, and a CPI × SPI quadrant chart in minutes — without an implementation contract.